-
Leopold School
In January 2011, we were appointed, as part of a design and build team, by the London Borough of Brent…
-
St James Primary School
In November 2009 we were approached by a local primary school who wished to reconfigure their entrance and staff areas.…
-
Meadowbank ALC
In December 2008, we were appointed, as part of a design and build team, by the London Borough of Hounslow to remodel…
-
Chesterfield Infants School
In July 2005, we were appointed, as part of a design and build team, by the London Borough of Enfield…